Skip to content
Xinyuanyi

Solutions

Enablement for Domestic and Non-NVIDIA Accelerators

Accelerator enablement

Updated

The problem

Buying domestic or non-NVIDIA accelerators is only the first step. Inference frameworks must be rebuilt, cache-library read paths rewritten and multimodal operators verified one by one. Until someone does that work, the cards are just hardware in a rack.

Our approach

We adapt the inference stack at source level and publish a separate measured report for each platform: 8 × AMD MI308XR1, 8 × Huawei Ascend 910BR9 and MetaX N260R5. Figures from different platforms are labeled separately and never merged into one headline.

Key points and sources

  • Source-level builds and patches of vLLM / LMCache on ROCm: the parallel-read patch improves TTFT by 4.1×R1
  • Measured on several platforms: R1–R4 on MI308X, R9 on Ascend 910B, R5 on MetaX N260
  • Multimodal works as well: all 7 ComfyUI + LTX-Video 2.3 models run on MI308X / ROCm 7.2 with no operator or kernel errorsR6R7
  • Delivered down to the code: git patches, load client, orchestration and forensic scripts, and the raw dataR8

Related test reports

Related products

Test jointly first, decide afterwards

Every engagement starts with a gated joint test of about 10 weeks. Four gates are passed in sequence; if one is missed, the project stops there, so you never pay for a benefit that was not demonstrated.

  1. G1Week 2

    Delivery acceptance

    All materials delivered and inspected; every array passes its power-on self-test with all 24 drives recognized.

  2. G2Week 4

    Single-node baseline

    The single-node 8-GPU inference baseline is reproduced within ±10% of the R1 figures; a local stress test of one array reaches 83% line efficiency against the measured anchor.

  3. G3Week 7

    Main joint-test gate

    KV tiering must deliver both a TTFT reduction of ≥25% and a throughput gain inside the measured +29–40% band; with 8 nodes sharing one array, read-back bandwidth approaches the NIC ceiling.

  4. G4Week 10

    Stability and sign-off

    72 hours of continuous load without interruption; single-drive and single-link fault injection stays invisible to the workload; a signed joint-test report is issued.

Other solutions

Test jointly first, decide afterwards

Test jointly first, decide afterwards

Every engagement starts with a gated joint test of about 10 weeks. Four gates are passed in sequence; if one is missed, the project stops there, so you never pay for a benefit that was not demonstrated.

Contact
Wang Limin
Phone
+86 131 6181 8898
Email
mingxin@agentmail.to

The inbox is monitored and triaged by AI around the clock