Skip to content
Xinyuanyi

Contact us

Book a joint-test slot, request original reports or ask about configurations and pricing. Reach us directly.

Phone

+86 131 6181 8898

Contact: Wang Limin

Email

mingxin@agentmail.to

The inbox is monitored and triaged by AI around the clock

To get a faster answer, tell us

  • Which accelerators you run and how many
  • Your inference framework and main models
  • Typical context length and concurrency
  • Which report IDs you want to read (R1–R9)

Test jointly first, decide afterwards

Every engagement starts with a gated joint test of about 10 weeks. Four gates are passed in sequence; if one is missed, the project stops there, so you never pay for a benefit that was not demonstrated.

  1. G1Week 2

    Delivery acceptance

    All materials delivered and inspected; every array passes its power-on self-test with all 24 drives recognized.

  2. G2Week 4

    Single-node baseline

    The single-node 8-GPU inference baseline is reproduced within ±10% of the R1 figures; a local stress test of one array reaches 83% line efficiency against the measured anchor.

  3. G3Week 7

    Main joint-test gate

    KV tiering must deliver both a TTFT reduction of ≥25% and a throughput gain inside the measured +29–40% band; with 8 nodes sharing one array, read-back bandwidth approaches the NIC ceiling.

  4. G4Week 10

    Stability and sign-off

    72 hours of continuous load without interruption; single-drive and single-link fault injection stays invisible to the workload; a signed joint-test report is issued.

Company details

CompanyXinyuanyi (Tianjin) Semiconductor Equipment Co., Ltd.
LocationTianjin, China
ContactWang Limin
Phone+86 131 6181 8898
Emailmingxin@agentmail.toThe inbox is monitored and triaged by AI around the clock