Glossary
What Is KV cache tiering?
KV cache tiering places KV cache on different media according to how hot it is: GPU memory holds active sessions, host RAM holds recent ones, and external all-flash storage holds all historical sessions and shares them across instances. The first two tiers are managed by the inference framework; the third needs a dedicated storage device.
Updated
In the measurements
Related test reports
- R2FX100 KV Cache Benchmark (480B, TP8, Long Context)Qwen3-Coder-480B-FP8 deployed as one 8-GPU instance (TP=8), the standard production topology, under a long-context cold-recovery load. A three-way comparison of FX100, a single local NVMe drive and full recompute without external storage, stepped across concurrency 8 / 16 / 32. Most throughput and TTFT figures quoted on this site come from this report.
8 × AMD Instinct MI308X · ROCm 7.2 - R3FX100 KV Cache Benchmark Summary (480B, TP4×2, All Metrics)The same 8-GPU server redeployed as two 4-GPU instances (TP4×2), with every metric recorded across nine load levels: TTFT p50 / p90 / p99, TPOT, throughput and disk bandwidth. The report also verifies two things: the fs:// shared pool lets both instances hot-share one cache, and two independent runs at the same level deviate by no more than 5%.
8 × AMD Instinct MI308X · ROCm 7.2
Nearby terms
- KV cache
The KV cache is the intermediate state an LLM keeps during inference: the key and value tensors computed at each attention layer for every token already processed. With it, the model does not have to recompute the preceding context when generating the next token. The longer the context, the more GPU memory the KV cache occupies.
- TTFT (time to first token)
TTFT (time to first token) is the time from sending a request to receiving the model's first token, and it decides how responsive a service feels. It is dominated by the prefill phase: the model must process the entire input before it can start producing output.
Test jointly first, decide afterwards
Test jointly first, decide afterwards
Every engagement starts with a gated joint test of about 10 weeks. Four gates are passed in sequence; if one is missed, the project stops there, so you never pay for a benefit that was not demonstrated.
- Contact
- Wang Limin
- Phone
- +86 131 6181 8898
- mingxin@agentmail.to
The inbox is monitored and triaged by AI around the clock